Want It Done By Christmas?

Bathroom Moodboard by designbykaty.com

On a recent site visit to a prospective client, who wanted a quote for their kitchen and bathroom installation, my husband who runs Random Task Plumbing asked what they were having and did they have any plans he could see. The client didn’t know what they wanted, other than for all the works to be completed by mid December, in time for Christmas. Bearing in mind that the client hadn’t yet exchanged contracts on the property and presently lived in another part of the country.

Firstly, a detailed quote is impossible to give if you only have a rough idea of what you want, or don’t know what you want at all. Also any tradesperson worth their salt, will have at least a 2 to 3 month lead time, especially leading up to Christmas. Whilst basic help and advice can be given to guide clients regarding types of showers suitable for their water systems and the feasibility  to move the loo to a different location (soil stacks are often forgotten by clients) and draw a scaled plan, most small tradespeople don’t have the time to offer a detailed design consultancy. The fixtures, fittings and finishings have to be chosen by you, the client. After all it’s your bathroom, kitchen etc. and it’s imperative that you love the finished results, it’s your home.

Bathroom Moodboard by designbykaty.com
Detailed Bathroom Moodboard by Designsbykaty.com

So before calling a tradespersons to quote, take time over your plans, keep revisiting them and show them to other people. Think about how you will use the space and how you want it to make you feel. If this is difficult for you, then an Interior Design consultancy is invaluable. For as little as £95.00 a design consultancy could save you a lot of time and possibly money too. Good interior design is about planning, not just about carefully coordinated fabric and paint swatches. This consultancy maybe all you need to set you off to implement yourself. If you require more help tailored to your specific needs, these can be accommodated too, regardless of budget. Of course everyone has budget.

First floor plans of a four bedroom house
You don’t need such detailed drawings unless major renovations are planned.

Interior Designers use local trade, craftspeople and suppliers and only recommend those whose work and people they trust. When deciding, look at reviews, ask to see previous completed work. Personality compatibility also is valuable – can you work with them?

I understand that you want everything ‘done’ and perfect for Christmas, but be realistic with your time scales. Even when you’ve decided on your plans, fixtures, fittings etc. There are supplier lead times to consider too. The last thing you want is a half-finished job over the festive season, especially if planning to have guests.

assembled cupboard carcass's
Kitchen install in progress not what you want at Christmas
After - Kitchen with island and glass partition wall and door to hall.
After – Kitchen with glass partition and door to hall

Once you have detailed plans, you can then invite local tradespeople to quote and provide approximate dates of availability. They will all be able to quote ‘from the same song sheet’, which makes price comparisons clearer. However, remember that cheaper isn’t always better, you often get what you pay for. Allow for a lead time on quotes being received too.

Tiling in progress in shower en-suite shower area
A half finished guest en-suite – not what you want when having guests
Completed Guest En- Suite
Completed Guest En- Suite

Plan the work in stages – what can be implemented and finished by your self-imposed Christmas deadline? Is this in the correct order of your work schedule? If so, fine. If not, then it’s far more beneficial to be patient and schedule the works for early in the New Year, thus eleviating the extra stress of Christmas and giving your home the consideration it deserves.

There’s  always next Christmas!

 

Preparing Your Home For Selling

For Sale/Sold Sign by Zazzle
For Sale/Sold Sign by Zazzle
How long will it take to sell your home?

Spring is a popular time to market and hopefully sell properties, and once that decision has been made, you contact your local agent for a valuation. Agents valuations are based on similar properties to yours currently sold or for sale in the area.

Now, if you’ve lived in your home for many years maybe it  has become a little ‘tired’ or dated’, but would rather sell ‘as is’. Possibly at a lower selling price and taking longer to sell, rather than face doing any work, spending money, in the hope that a DIY enthusiast will see the potential and relish the challenge, some do, many people don’t see the potential or want to undertake the work.

You can ask your agent (if your home is tired or dated) for two valuations – ‘as is’ and ‘tidied up’. Depending on the individual agent, they may advise that it’s not worth spending any money or the effort, as the return will not out weigh the costs involved. Or they may be happy to advise on both scenarios. If the agent offers both marketing prices, you can work out your parameters of what you would be prepared or need to spend for the ‘added value’ and make an informed decision on whether you should implement the improvements or not.

Kitchens and bathrooms are two of the biggest influences on a sale. The view often being, don’t change it, as whoever moves in will rip it out and put in new. Possibly, either straight away, in time, or just don’t want the expense and hassle. Again, compare the ‘added’ value’ and costs, this will help you make your decision. Think about your target market: who is likely to want to buy your home? What will they be looking for?

Front path and door of Victorian house
Ensure the front of your home looks promising.

Whether or not you intend to carry out any updating, your home should still be prepared and ready to market for great photographs for the internet, brochures and actual viewings. Cleaning, especially bathrooms and kitchens, de clutter, windows should sparkle. De-personalise by packing away personal items (well you’re moving aren’t you?) so prospective purchasers can see how their belongings will fit in or not. Don’t be precious, be objective and try to see the house as a commodity rather than your home. If you find this difficult, ask friends ( however they may not be totally honest with you) Estate Agent or Home Staging Professional for their view and recommendations. Refresh garden containers with seasonal plants to brighten up dull corners of your outside space.

Case Study – Before and After of a ground floor flat which I completed last year for marketing and selling. The flat had become outdated and ‘tired’. This was the hardest job I think I’ve ever carried out, the flat had belonged to my dear mother.

The target market was an older individual or couple, perhaps downsizing or retiring, who would probably want to move straight in and not have any or very much to do.

Living Room

Working with a neutral palette to create a cohesive look in a small flat, all the rooms, including the paint work was painted the same colour. A new cream carpet was laid throughout. In the living room the 1960’s fire-place and surround was replaced with a smaller contemporary model. Although excess furniture and personal effects have been removed, we re-used some of the existing furniture and rearranged its layout.

Kitchen

Unfortunately, I don’t have any pictures of the ‘before’, of the kitchen, but the units were dark brown wood, beige work top and beige speckled tiles with an occasional fruit or vegetable tile – a 1980’s throwback. The units were in good condition and the design layout worked ergonomically, it was just that it looked dated.  Painting the cabinets an off white, replacing the work top and changing the tiled splash back to white metro in brick style made the kitchen much brighter, more contemporary and up to date.

Guest Bedroom

The guest bedroom was originally very cramped and cluttered. By removing the shelves, wash basin and tiled splash back and a single bed more space was created. Freshly decorated walls and cupboards which were fitted with new knobs, and a new fitted carpet laid. Again,  some of the original furniture and accessories were re used during the bedroom re-design.

Main Bedroom

Main Bedroom. The textured wall paper was removed, and the walls and woodwork were repaired and freshly painted in the same colour as the rest of the flat. The curtains and track were removed, leaving just the blind. The  furniture layout was rearranged, excess furniture was removed, and some items from other rooms were introduced. A new carpet was laid.

Shower Room

Small shower room
Shower Room

Although this work was done prior to the staging of the flat, it would have been necessary to include refurbishing the bathroom. The original pink bathroom suite was replaced with a large 1200 mm walk in shower, with room for a stool if required. The walls were tiled to full height on all walls. A vanity basin provides storage.  Extra storage ( not seen) was provided by a tall cabinet. The adjacent toilet has the same wall tiles and an extra high toilet was installed.

By investing time and money the property increased in marketing value by £35,000 and sold very quickly. But do your own sums, it’s all in the numbers!

Images by Sarah Maidment Interiors, Sign by Zazzle, Front door by rhsblog.co.uk Pots by http://www.etthem.se

Renovation and Restoration of a 1930’s House Before and After Pictures

Front porch of renovated 1930's house

I have now compiled ‘before and after’ pictures, with the occasional ‘during’ photo (remember it always gets worse before it gets better) which I hope you’ll enjoy and give you momentum to commence or  finish your projects.

The renovation and restoration of a 1930’s house is finished! Are you ever finished in a home? Probably not.

Front Elevation

Before – Sad and neglected                                        After – Restored and extended

Hall

Before - The original 1930s' entrance hall prior to renovations.
Before – The original front entrance hall prior to renovations.
Original 1930's entrance hall
Before – The original hall was dark and poky.
Acro props before steel beam is installed
During an internal hall wall removal.

 

After - The finished entrance hall in a 1930's house
After – The completed entrance hall

Sitting Room

Before - The sitting room with the original 1930's brick fireplace.
Before – The sitting room with the original 1930s’ brick fireplace.
After - The original 1930's brick fireplace cleaned up
After – The original 1930’s brick fireplace was retained, so too were the original Crittal French doors.
Before Original 1930's sitting room complete with Crittal French doors and brick fireplace
Before – A 1930’s sitting room with original Crittal French doors and brick fireplace.

Kitchen

Before - The original 1930's dining room
Before – The original 1930’s dining room
During - The wall dividing the kitchen and dining room has been removed.
The dividing wall between the kitchen and dining room has been removed, to be re-positioned.
After - the completed new kitchen
After – The completed kitchen
After - Kitchen with island and glass partition wall and door to hall.
After – Kitchen with glass partition and door to hall. Original servants bell box is re-hung – shame no staff though!
Open plan kitchen/diner/day room with bi-fold doors onto garden.
View into dining/ day room area from kitchen
Before- original 1930s' dining room
Before- the original dining room prior extension and renovation work – damp wall is now where clock is hung.

Living Room

Rear Footings 3rd feb 2015
Before – Laying the foundations
Painted Stove and Fireplace
During – Marking the wall for the multi-fuel stove
Trescotte Sitting Room Afer 073
After – The finished sitting room

Family Bathroom

Before- A tired and dated bedroom                         After – A family bathroom

Master Bedroom

Master Bedroom during construction
The first fix electrics in the master bedroom
After - Large master bedroom with Heals four poster bed
After – The finished master bedroom
master bedroom with four poster bed from Heals
After – The large master bedroom complete with a four-poster bed from Heals.

The Loo

Before with original cistern          After – Re-sited and restored cistern

Guest Bedroom

Originally a landing with airing cupboard, bathroom with separate loo. Now a guest bedroom, painted in ‘Setting Plaster’ Farrow and Ball http://www.farrow-ball.com/setting%20plaster/colours/farrow-ball/fcp-product/100231

Rear Elevation

Before – An overgrown garden                           Waiting to mature!

However carefully one plans either a renovation or restoration project, it rarely comes in on budget – it’s usually over budget. This is not just because of unforeseen problems like discovering structural problems once the work has commenced, it can due to adding a few extra plug sockets here and there (it all adds up) or choosing high specification kitchen, bathrooms and fittings. Usually it’s because we’ve under estimated the basic build/renovation costs – raw materials labour plus VAT.  Comparing your projected budget spread sheet to the actual costs spreadsheet, helps analyse where you under budgeted or over spent.

Did we go over budget? Yes, we knew we’d go over budget when we decided to install the Sonas system. However, the original quote was less than the final invoice due to the time-lapse between the first fix and completion – the labour and equipment had increased in price. The quote was valid for 30 days only, lesson learned.  The building material costs were higher too, despite having a breakdown of these costs from the supplier which our budget spreadsheet was based upon. Generally, the majority of people under-estimate their expenditure.

With the uncertainty of property the market, and the impact Brexit may have, many home owners are opting to improve their current home instead of moving. Having had nearly forty years experience in renovating properties, although home values may dip from time to time, they always go up, and on the whole a good investment.

If you think I can be of benefit to you and your project, whether big or small just contact me.

Floor tiles on cloakroom floor     http://www.firedearth.com/tiles/range/patisserie/sucre-1 and entrance floor  http://www.firedearth.com/tiles/range/casino-floor/mode/grid

Artwork by Kim Major George  http://www.majorgeorge.co.uk/

 

 

Renovation and Restoration of a 1930’s House – Don’t You Just Love Technology?

Sonas System image via Pinterest

 

Sonas System image via Pinterest
Sonos System

It was suggested, prior to the first fix electrics to install a Sonos music system.  After much thought and discussion about going over our original budget, we decided it would be a good idea. TV and internet ports were also installed in some bedrooms as well as the living areas, the idea being that family members could use the internet independently to stream films, games etc.  Our electrician laid all the cables and the builders left gaps in the ceiling ready for the speakers. The mass of wires leading back to a cupboard where the system will be controlled from. The installers of the Sonos System wanted the house to be virtually dust free before fitting.

Ceiling Speaker
An unobtrusive ceiling speaker

Sounds good, and so far so good, until we came to install a phone line and broadband. An internet search of post code speeds and providers showed lots of options and costs too, including BT Infinity, Sky Fibre Unlimited, EE and TalkTalk. BT Infinity showed the estimated speed at 22.8 – 38Mb. As a current BT customer I organised the contract and booked in an installation date. However, when reading through the info received BT had estimated the broadband speed at 1Mb – 4Mb. This is a huge difference, especially when streaming films, downloading computer games and music. I questioned BT about the speed, and they explained that half the village did indeed have fibre optic cable, but my house is in the half that doesn’t; and they had no plans in the foreseeable future to install the other half. So we have all the technology wired in, but inadequate broad band service to actually run it all at the same time.

Broad Band Speeds for your area can be found in the internet
Broad Band speeds for our post code found on the Internet

A neighbour came by just by chance with some information about a company who provide a better broadband speed of up to 40Mb. He had just set up an account and had the system installed, due to his frustration with BT. This sounded promising.

The system works via EE’s 4G mobile network. The company will install an external antenna which connects to a 4G modem and allows for both wired and WIFI access through EE. It is also possible to move your current landline number to an internet based phone system, removing the need for a BT landline. The cost of this phone system is £2.50 a month line rental and 1.2p per minute for calls. A typical cost for the installation is £799.00, plus system interface and configuration charges plus plugs, plus plus….. But then we may save on call charges etc.

Two contracts are offered, either a 30 day rolling contract offering 15GB for £20.00 or 25GB for £30.00 per month. Or 24 month contract at £28.00 a month for 25 GB or 50GB at £55.00. Checking our current average monthly data usage (currently unlimited) this was insufficient for our needs. The maximum for a consumer available is 50GB a month, but we can add more at £15.00 for 10GB. The company didn’t specify whether that was £15.00 for each additional 10GB on top, but guessing it is. This makes a huge difference to the cost. If your usage comes within 50GB, then it’s sounds like a great system in rural and not so rural areas. Anywhere in fact BT haven’t bothered to install sufficient fibre optic cable, despite the Government promises!

So where does that leave us? Well, with BT, as there appears to be little else we can do.  Unfortunately, BT failed to turn up at the appointed time and date. Neither did they call or text to say they weren’t coming. For a communications company their communication skills are shocking. So back to the buffering and waiting for things to down load. Don’t you just love technology?

Selecting tiles for kitchen
‘Mood Board’ of tiles and work top

The work top in the kitchen has been installed by a local stone supplier, who have a huge range and choice of materials and colours to choose from. They also template and fit the work tops. I was lucky enough to find an off cut of Silestone which was suitable, and therefore a little cheaper. Silestone is a composite stone, offering hardwearing capabilities, and is less expensive than granite. Again shop around as prices vary enormously between suppliers. I have chosen to tile the splash back rather than have an upstand, to make the space more cohesive. I didn’t want an upstand with a tiled or glass backing behind the hob, which would break up the run above the work top.

 

 

Utility and Boot Rooms

Interior decoration in our main living areas is always top of our priorities. However, have you ever wondered when walking around beautifully staged show homes where you will keep your vacuum cleaner? Indeed if the home does not have a utility room, where you will keep your ironing board, iron, the pile of ironing for that matter, and the plethora of cleaning materials – in the kitchen or under-stairs cupboard? Even the most modest of Victorian terraced homes had an out house or scullery with a sink and perhaps an old copper to heat the water for wash day. Laundry was not generally performed in the kitchen, this was kept for food preparation only. In today’s modern, modest homes the washing machine is located in the kitchen, which means losing valuable cupboard space. The same loss of space if you have a dryer, and associated cleaning materials and tools. If you have the space, then a utility room is a must.

The minimum space required along a wall is 190 cm, this would allow 60 cm width for the washing machine, 60 cm for the sink and draining board and 60 cm for a tall cupboard to house products and tools – even the vacuum cleaner. If you have a dryer this can be put on top of the washing machine. The minimum depth of space required is 1500.  60cm  being the average measurement of appliances and cupboards, plus room to open the appliance and cupboard doors. Layout examples below.

Utility rooms are best located near the kitchen, with it’s own access to the garden. This allows ease of access to the garden for the washing line, and somewhere to leave muddy footwear and hang everyday outerwear. If a separate room is not possible, and you have an integral garage, which does not house your car, but used for general storage, section a partition wall and place your utility area in the garage. Another option is to designate one wall in your kitchen (or elsewhere if space allows) as the laundry area (minus a sink) and hang sliding or bi-fold  doors across the whole lot, so it looks like a cupboard when not in use.

Plumbing requirements need to be planned, hot and cold supply to the sink, cold water to the washing machine and waste from both into a drain. If opting for a dryer too it will need venting through an outside wall. If this is not possible opt for a condensing dryer. Washer dryers are an option too, but these need to be vented.

White Goods -Appliances – Buy the best quality you can afford. Meille being the top of the range.  Consider whether you want integrated appliances, hidden behind doors. If so you need to purchase integrated appliances specifically designed for the purpose.

Cupboards and Storage – A tall cupboard with well designed interior space arranged so that items can be easily retrieved. Think about whether yo would prefer doors or drawers under the sink. A ‘Sheila Maid’ or rack above the sink for drying clothes is useful.

Flooring – Porcelain or ceramic floor tiles are durable, waterproof and are the best choice in utility rooms. If the room is directly off the kitchen, use the same floor tiles as the kitchen as this makes the space larger. Lay electric matting underfloor heating under the tiles instead of a radiator. This frees up valuable space and prevents the floor from being cold.

Rustic hard wearing tiled floor
A hard wearing rustic tiled floor

Lighting – If space, opt for a window as well as a door, if not have a door fitted with glass to let natural day light in. Energy efficient, good quality  daylight white or warm white fluorescent tubes provide the most economic, practical and shadow free task light. Under cupboard downlights, track spot or pendant lights are also an option.

Sinks  – Consider the use of the sink. If used for cleaning muddy football boots the  Butler sink is ideal. If only used for water to wash the floor a stainless steel or ceramic sink will be adequate. A high level mono tap is best in a utility room, so you can fill a bucket or whatever easily. Worktops – Your choice of work top will be lead by your choice of sink. However, laminate is fine, but will not stand up to hard wear and tear. A granite or stone composite is hard wearing and grooves can be cut for drainage, eliminating the need for a sink and drainer set up.

Decor – If the room is accessed directly from the kitchen, use the same wall paint or a tonal shade. If having a splash back behind the sink use the same tiles as in the kitchen if you have them. If not a plain white brick style tile will create a utilitarian feel.